EPS Emergency Power Supply Installation Note

發(fā)布時間: 2010/02/24 人氣 :2673
·EPS Emergency Power Supply Installation Note
1. EPS power installation should give full consideration to the load characteristics and power supply object, configurate suitable EPS products according to the actual load type size and the function. Such as: EPS must drop 5 times the amount used with motor load; EPS must drop the forehead 10% use with elevation 1000 meters rise etc;

2. EPS internal cooling fan of power is affected by microcomputer control of speed regulation of fan (EC fan), only in the case that the temperature rise to a certain numberand the internal cooling fan begin to work, It must be noticed that the installation doesn’t block cooling fen and ventilation . 3. EPS ‘s position must be far away from the fire origin and combustible, and ordinary sundry don't pile up in EPS;s position It is unfavourable to fire safety and easy to attract rodents who chew on cable and cause accidents;

4. The moist air in spring and summer is prone to make EPS internal control condensation on printed circuit boards, thus trigger EPS control fault, so EPS try choosing moisture proof space;

5. There cannnot too much dust in EPS’ position ,or electrostatic interference The positive charge dust in the circuit board will damage EPS panel at the same time EPS equipment should have good grounding;

6. The area can't close to windows and doors, in order to prevent the water immersion, the rain, the sun, and influence EPS normal life;

7. To prevent EPS power supply breakdown, worker should examine whether voltage is normal at the voltage supply and the detection of utility, zero, whether they are dislocation, especially of double road with a backup utility or generator of power network, and check the first all the way is consistent with the first two main electricity reserve power supply of zero

8. EPS before electric start the output circuit must be the root of the specifications of the switch power supply circuit of reasonable configuration cable and load, emphatically detection circuit short circuit, sequence and zero, the sequence. After power checking the actual detection circuit load voltage circuit data such as parameters, contrast circuit switch specifications, appropriate adjustment, avoiding overloading phenomenon;

9. EPS installation is completed, checking the normal starting on the equipments, emergency start, mandatory start, linkage start one by one, repairing the existing problems in time, and do the control key and lock the handover.

?
人人操人人妻人人爽| 老子午夜理论影院理论| 色综合久久无码| 国产亚洲精品视觉盛宴| 日本va在线观看| 亚洲 s色| 好了AV大香蕉| 高清无码电影| 男人久久精品| 亚洲阿v天堂| 69精品少妇| 国产∨亚洲V天堂无码久久久| 狠狠色发布| 涩爱av| 亚洲国产日韩在线人高清| 91无码精品久久久一区| 久久黄色亚洲| 亚洲综合一区日韩| 欧美色激情| 日本色网址| 九九夜国产| 精品天堂mv| 久久国产精品99精品国产| 国产精品186在线观看在线播放 | 日本成人电影免费网| 丰满岳hd| 中文字幕一二三综合a| 亚洲国产AV一区二区| 综合久久2020| 四虎影院NASH| 六月婷婷久香在线视频| 欧美精品三区四区五区| 91精品国产高清久久久久久久久| 亚洲欧美在线天堂| 免费黄色成人片| 久久夜色国产精品亚| ddd42iii| 九色影院| 五月天激情综合色吧| 久久艹最新av| 久久六月婷婷|